Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2016, 12:52 PM
  • 22 0264_22 0337_20160104_060159.mp4

Date
01/04/2016
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16547
Time
4:52 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3023
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0264
Downstream MH
22 0337
Dir. of Survey
Downstream
Length Surveyed
52.2 ft.
Total Length
52.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0264 to 22 0337
MH: 22 0264MH: 22 0337downstream0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 02640 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.3 ft. MGO - General Observation - MAGNESIUM H.O. START48.4 ft. MGO - General Observation - MAGNESIUM H.O. FINISH48.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish48.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish52.2 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE52.2 ft. MGO - General Observation - BULKHEAD AT MH52.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0337

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    48.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (15)

DistanceCodeObservation
8.3MGOMAGNESIUM H.O. START
0VC
0AMH22 0264
0MGOLATERAL AT MH 3 O'CLOCK CAPPED
48.5SAP
48.4MGOMAGNESIUM H.O. FINISH
0MWL
2.2DAGS
0MWM
52.2MGOLATERAL AT MH 3 O'CLOCK ACTIVE
0MGOLATERAL AT MH 9 O'CLOCK ACTIVE
52.2MGOBULKHEAD AT MH
48.5DAGS
52.2AMH22 0337
2.2SAP

Properties (5)

additional_info
SC224615
custom_field_two
3
customer
LACSD
datetime
2016-01-04T04:52:35-08:00
sewer_category
GRAVITY