Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 4, 2016, 12:17 PM
  • 22 0265_22 0264_20160104_054550.mp4

Date
01/04/2016
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16548
Time
4:17 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3023
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0265
Downstream MH
22 0264
Dir. of Survey
Downstream
Length Surveyed
441 ft.
Total Length
441 ft.
Structural Index
2
Structural Quick
3111
Structural Rating
4
O&M Index
2
O&M Quick
2412
O&M Rating
10
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 22 0265 to 22 0264
MH: 22 0265MH: 22 0264downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02650 ft. MWL - Water Level, 10 %of cross sectional area0.7 ft. MWM - Water Mark, 15 %of cross sectional area2.1 ft. MGO - General Observation - MAGNESIUM H.O. START2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"13.7 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES47.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"56 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"104.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"106.8 ft. VC - Vermin Cockroach108.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"138.9 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"141.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"157.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"188.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES206.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"213.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES215 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"249.2 ft. TBI - Tap Break-In Intruding, at 09 o'clock, -, -, within 8 inches of joint: YES, 4", 1"260.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"308.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"317.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"361.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"381.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"410.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"438.4 ft. MGO - General Observation - MAGNESIUM H.O. FINISH438.4 ft. MMC - Material Change, Vitrified clay pipe438.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish438.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish441 ft. AMH - Downstream Manhole, Survey Ends - 22 0264441 ft. VC - Vermin Cockroach441 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK CAPPED441 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE

Observation photos (5)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

    13.7 ft. - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Settled Compacted,  10 %of cross sectional area, from 06 to 07 o'clock,  , within 8 inches of joint: YES

    188.9 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES

  • Deposits Settled Compacted,  10 %of cross sectional area, from 06 to 07 o'clock,  , within 8 inches of joint: YES

    213.8 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 06 to 07 o'clock, , within 8 inches of joint: YES

Observations (35)

DistanceCodeObservation
308.9TFC
0AMH22 0265
106.8VC
438.4MGOMAGNESIUM H.O. FINISH
2.1MGOMAGNESIUM H.O. START
438.4MMC
13.7CC
188.9DSC
213.8DSC
141.9TFC
56TFC
438.4DAGS
104.8TFC
157.9TFC
410.4TFC
438.4SAV
260.1TFC
138.9TBA
47.8TFC
441AMH22 0264
108.8TFA
249.2TBI
0.7MWM
441VC
7.1TFA
441MGOLATERAL AT MH 3 O'CLOCK CAPPED
381.8TFC
317.2TFA
361.8TF
0MWL
2.1SAV
215TFC
206.6TFC
2.1DAGS
441MGOLATERAL AT MH 9 O'CLOCK ACTIVE

Properties (5)

additional_info
SC224615
custom_field_two
3
customer
LACSD
datetime
2016-01-04T04:17:00-08:00
sewer_category
GRAVITY