Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 11:54 AM
  • 22 1388_22 0268_20151231_050158.mp4

Date
12/31/2015
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16553
Time
3:54 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3022
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0268
Downstream MH
22 1388
Dir. of Survey
Upstream
Length Surveyed
45.4 ft.
Total Length
45.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0268 to 22 1388
MH: 22 0268MH: 22 1388upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 13880 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE6.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish6.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish6.4 ft. MGO - General Observation - MAGNESIUM H.O. FINISH43.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.4 ft. MGO - General Observation - MAGNESIUM H.O. START43.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start45.4 ft. AMH - Downstream Manhole, Survey Begins - 22 026845.4 ft. MWM - Water Mark, 15 %of cross sectional area45.4 ft. MWL - Water Level, 10 %of cross sectional area45.4 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
45.4AMH22 1388
39DAGS
45.4MGOLATERAL AT MH 3 O'CLOCK ACTIVE
0AMH22 0268
2SAP
39.1SAP
39MGOMAGNESIUM H.O. FINISH
0MWM
0MWL
2MGOMAGNESIUM H.O. START
2DAGS
0MGOLATERAL AT MH 3 O'CLOCK ACTIVE

Properties (5)

additional_info
SC224614
custom_field_two
3
customer
LACSD
datetime
2015-12-31T03:54:39-08:00
sewer_category
GRAVITY