- Date
- 01/07/2016
- W/O
- 547395
- Weather
- Dry
- Operator/Surveyor
- R. VARGAS
- Sewer ID
- Z00793
- PipeID
- P16518
- Time
- 1:38 PM
- Certificate
- U-209-211
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- No Pre-Cleaning
- Media Label
- K3030
- Sewer Name
- 22 CAMERON TRUNK, SECTS 1,2,&3
- City
- WEST COVINA
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 22
- Page No.
- 35
- Purpose
- Routine Assessment
- Project
- WO_547395_TV22016_JAN2016
- Material
- NRCP
- Shape
- Circular
- Height
- 18 in.
- Upstream MH
- 22 0236
- Downstream MH
- 22 0235
- Dir. of Survey
- Downstream
- Length Surveyed
- 423.7 ft.
- Total Length
- 423.7 ft.
- Structural Index
- 2
- Structural Quick
- 342C
- Structural Rating
- 54
- O&M Index
- 2
- O&M Quick
- 322F
- O&M Rating
- 82
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 136
Pipe schematic from manhole 22 0236 to 22 0235 Observation photos (4)

2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

27.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

66.6 ft. - Obstacles Construction Debris, 15 %of cross sectional area, from 04 to 08 o'clock - NOT VISIBLE