Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 10:30 AM
  • 22 0267A_22 0267_20151231_034806.mp4

Date
12/31/2015
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16551
Time
2:30 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3022
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0267A
Downstream MH
22 0267
Dir. of Survey
Downstream
Length Surveyed
309.6 ft.
Total Length
309.6 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
2
O&M Quick
2411
O&M Rating
9
Overall Index
2
Overall Quick
Overall Rating
18
Pipe schematic from manhole 22 0267A to 22 0267
MH: 22 0267AMH: 22 0267downstream0 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 0267A0 ft. MWM - Water Mark, 15 %of cross sectional area2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAGNESIUM H.O. START19.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"44.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"50.9 ft. RFJ - Roots Fine Joint, at 02 o'clock, within 8 inches of joint: YES68.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"93.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"121.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"142 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4" - CAPPED CRACK INSIDE161 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES166.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"194.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"205.9 ft. FL - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES219.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"243.3 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 4" - CAPPED CRACK INSIDE268.1 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 4" - CAPPED CRACK INSIDE292.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"305.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish305.8 ft. MGO - General Observation - MAGNESIUM H.O. FINISH305.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish309.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0267

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    161 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    205.9 ft. - Fracture Longitudinal, at 02 o'clock, within 8 inches of joint: YES

Observations (26)

DistanceCodeObservation
2.3SAP
44.1TFC
243.3TFDCAPPED CRACK INSIDE
0MGOLATERAL AT MH 9 O'CLOCK ACTIVE
93.1TFC
166.6TFC
219.2TFC
0MWL
142TFDCAPPED CRACK INSIDE
205.9FL
121.6TFC
0AMH22 0267A
305.8SAP
309.6AMH22 0267
50.9RFJ
305.8MGOMAGNESIUM H.O. FINISH
194.7TFC
305.8DAGS
68.4TFC
292.1TFC
268.1TFDCAPPED CRACK INSIDE
19.5TFC
2.3DAGS
2.3MGOMAGNESIUM H.O. START
161FL
0MWM

Properties (5)

additional_info
SC224614
custom_field_two
3
customer
LACSD
datetime
2015-12-31T02:30:47-08:00
sewer_category
GRAVITY