Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 10:08 AM
  • 22 0268_22 0267A_20151231_032755.mp4

Date
12/31/2015
W/O
547395
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16552
Time
2:08 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3022
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0268
Downstream MH
22 0267A
Dir. of Survey
Downstream
Length Surveyed
126.2 ft.
Total Length
126.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0268 to 22 0267A
MH: 22 0268MH: 22 0267Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02680.2 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAGNESIUM H.O. START2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"19.2 ft. VC - Vermin Cockroach43.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"68.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"93.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"117.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"123 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish123 ft. MGO - General Observation - MAGNESIUM H.O. FINISH123 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish126.2 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE126.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0267A

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    123 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (18)

DistanceCodeObservation
0MWL
0MWM
43.7TFC
123DAGS
19.2TFC
123MGOMAGNESIUM H.O. FINISH
2.1DAGS
68.4TFC
126.2MGOLATERAL AT MH 9 O'CLOCK ACTIVE
0.2MGOLATERAL AT MH 3 O'CLOCK ACTIVE
93.7TFC
126.2AMH22 0267A
19.2VC
117.6TFC
0AMH22 0268
2.1MGOMAGNESIUM H.O. START
123SAP
2.1SAP

Properties (5)

additional_info
SC224614
custom_field_two
3
customer
LACSD
datetime
2015-12-31T02:08:48-08:00
sewer_category
GRAVITY