Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 6, 2016, 07:53 AM
  • 22 0245_22 0244_20160106_010513.mp4

Date
01/05/2016
W/O
547395
Weather
Damp
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16527
Time
11:53 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3026
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
WO_547395_TV22016_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0245
Downstream MH
22 0244
Dir. of Survey
Downstream
Length Surveyed
223.3 ft.
Total Length
223.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2113
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 22 0245 to 22 0244
MH: 22 0245MH: 22 0244downstream0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02450 ft. MWL - Water Level, 15 %of cross sectional area2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. MGO - General Observation - MAGNESIUM H.O. START2.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start33 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"48.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"51.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"82 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"82.1 ft. VC - Vermin Cockroach118.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"160.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"173.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"212.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"219.5 ft. MGO - General Observation - MAGNESIUM H.O. FINISH219.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish219.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish223.3 ft. VC - Vermin Cockroach223.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0244223.3 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
118.6TFC
219.6DAGS
2.4MGOMAGNESIUM H.O. START
0VC
223.3VC
212.8TFC
0MWM
0AMH22 0245
219.5MGOMAGNESIUM H.O. FINISH
223.3AMH22 0244
2.4SAV
173.7TFC
219.6SAV
48.7TFC
160.9TFC
82.1VC
0MWL
82TFC
51.5TBA
2.3DAGS
33TFC
223.3MGOLATERAL AT MH 9 O'CLOCK ACTIVE

Properties (5)

additional_info
SC224619
custom_field_two
3
customer
LACSD
datetime
2016-01-05T23:53:10-08:00
sewer_category
GRAVITY