Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 07:25 AM
  • 22 0281_22 0280_20151230_233836.mp4

Date
12/30/2015
W/O
547382
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16567
Time
11:25 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3021
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_547382_TV22014_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0281
Downstream MH
22 0280
Dir. of Survey
Downstream
Length Surveyed
242.6 ft.
Total Length
242.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0281 to 22 0280
MH: 22 0281MH: 22 0280downstream0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 02810 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAGNESIUM H.O. START2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start43.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"76.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"97.1 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"100.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"104.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"149.4 ft. TBA - Tap Break-In Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"157 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"161.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"239.6 ft. MGO - General Observation - MAGNESIUM H.O. FINISH239.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish239.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish242.5 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE242.6 ft. VC - Vermin Cockroach242.6 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK ACTIVE242.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0280

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
2.6SAP
104.6TFC
0VC
242.6VC
2.6MGOMAGNESIUM H.O. START
97.1TBA
239.6MGOMAGNESIUM H.O. FINISH
0AMH22 0281
157TFC
242.5MGOLATERAL AT MH 3 O'CLOCK ACTIVE
239.6DAGS
149.4TBA
242.6MGOLATERAL AT MH 3 O'CLOCK ACTIVE
0MWM
76.3TFA
43.8TFA
100.7TBA
2.6DAGS
239.6SAP
242.6AMH22 0280
0MWL
161.6TFC

Properties (5)

additional_info
SC224613
custom_field_two
3
customer
LACSD
datetime
2015-12-30T23:25:03-08:00
sewer_category
GRAVITY