Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 06:58 AM
  • 22 0282_22 0281_20151230_231733.mp4

Date
12/30/2015
W/O
547382
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16568
Time
10:58 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3021
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_547382_TV22014_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0282
Downstream MH
22 0281
Dir. of Survey
Downstream
Length Surveyed
392.4 ft.
Total Length
392.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0282 to 22 0281
MH: 22 0282MH: 22 0281downstream0 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 22 02820 ft. MWL - Water Level, 10 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK CAPPED2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAGNESIUM H.O. START2.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start35.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"40 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"104.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"181.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"237.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"249.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"274.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"318.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"324.1 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"330.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"384.8 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"389.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish389.5 ft. MGO - General Observation - MAGNESIUM H.O. FINISH389.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish392.4 ft. VC - Vermin Cockroach392.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0281

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
0MGOLATERAL AT MH 9 O'CLOCK ACTIVE
2.6SAP
324.1TBA
237.9TFA
0AMH22 0282
249.9TFC
35.3TBA
274.5TFA
384.8TBA
389.5SAP
2.6MGOMAGNESIUM H.O. START
0MWL
389.5MGOMAGNESIUM H.O. FINISH
181.8TFA
392.4VC
0VC
2.6DAGS
0MWM
392.4AMH22 0281
330.9TFA
40TFA
318.9TFC
0MGOLATERAL AT MH 3 O'CLOCK CAPPED
104.7TFA
389.5DAGS

Properties (5)

additional_info
SC224613
custom_field_two
3
customer
LACSD
datetime
2015-12-30T22:58:53-08:00
sewer_category
GRAVITY