Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 06:40 AM
  • 22 0283_22 0282_20151230_225722.mp4

Date
12/30/2015
W/O
547382
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16569
Time
10:40 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3021
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_547382_TV22014_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0283
Downstream MH
22 0282
Dir. of Survey
Downstream
Length Surveyed
294.7 ft.
Total Length
294.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 22 0283 to 22 0282
MH: 22 0283MH: 22 0282downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02830 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK CAPPED0 ft. MWL - Water Level, 10 %of cross sectional area0.1 ft. VC - Vermin Cockroach2.3 ft. MGO - General Observation - MAGNESIUM H.O. START2.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"27.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"91.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"136.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"148.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"153.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"209.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"253.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"281.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"291.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish291.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish291.9 ft. MGO - General Observation - MAGNESIUM H.O. FINISH294.7 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE294.7 ft. VC - Vermin Cockroach294.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0282294.7 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK CAPPED

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
2.3MGOMAGNESIUM H.O. START
0AMH22 0283
291.9DAGS
294.7MGOLATERAL AT MH 9 O'CLOCK ACTIVE
281.9TFA
0MWM
27.2TFA
294.7VC
0MGOLATERAL AT MH 3 O'CLOCK CAPPED
136.4TFA
291.9SAP
0MWL
294.7AMH22 0282
209.1TFA
291.9MGOMAGNESIUM H.O. FINISH
153.1TFA
148.7TFC
91.9TFA
294.7MGOLATERAL AT MH 3 O'CLOCK CAPPED
0.1VC
2.3DAGS
2.3SAP
6.7TFA
253.7TFA

Properties (5)

additional_info
SC224613
custom_field_two
3
customer
LACSD
datetime
2015-12-30T22:40:50-08:00
sewer_category
GRAVITY