Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 06:21 AM
  • 22 0284_22 0283_20151230_223834.mp4

Date
12/30/2015
W/O
547382
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16570
Time
10:21 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3021
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
WO_547382_TV22014_JAN2016
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0284
Downstream MH
22 0283
Dir. of Survey
Downstream
Length Surveyed
248.7 ft.
Total Length
248.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2114
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 22 0284 to 22 0283
MH: 22 0284MH: 22 0283downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 02842.1 ft. MGO - General Observation - MAGNESIUM H.O. START2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"45.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"53.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"77.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"88.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"146.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"156.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"166.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"166.7 ft. VC - Vermin Cockroach199.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"217.1 ft. LL - Alignment Left, 5 %245.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish245.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish245.6 ft. MGO - General Observation - MAGNESIUM H.O. FINISH248.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0283248.7 ft. MGO - General Observation - LATERAL AT MH 3 O'CLOCK CAPPED248.7 ft. VC - Vermin Cockroach

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
2.1MGOMAGNESIUM H.O. START
2.2SAP
53.8TFA
88.6TFA
77.6TFA
217.1LL
245.6DAGS
45.4TFA
248.7AMH22 0283
0MWM
0MWL
146.6TFA
166.7TFC
0VC
245.6SAP
166.7VC
156.6TFA
6.3TFA
245.6MGOMAGNESIUM H.O. FINISH
2.2DAGS
199.3TFA
248.7MGOLATERAL AT MH 3 O'CLOCK CAPPED
0AMH22 0284
248.7VC

Properties (5)

additional_info
SC224613
custom_field_two
3
customer
LACSD
datetime
2015-12-30T22:21:15-08:00
sewer_category
GRAVITY