Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 30, 2015, 07:22 AM
  • 22 0297_22 0296_20151229_235153.mp4

Date
12/29/2015
W/O
547382
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00793
PipeID
P16583
Time
11:22 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3020
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_547382_TV22014_JAN2016
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
22 0296
Downstream MH
22 0297
Dir. of Survey
Upstream
Length Surveyed
420.4 ft.
Total Length
420.4 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0296 to 22 0297
MH: 22 0296MH: 22 0297upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02973.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish3.2 ft. MGO - General Observation - MAGNESIUM H.O. FINISH3.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish28 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"64 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"89.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"127.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"157.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"185.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"212.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"250.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"283.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"303.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"353 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"356.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"414.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"418.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start418.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start418.3 ft. MGO - General Observation - MAGNESIUM H.O. START420.3 ft. VC - Vermin Cockroach420.4 ft. AMH - Downstream Manhole, Survey Begins - 22 0296420.4 ft. MWL - Water Level, 10 %of cross sectional area420.4 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE420.4 ft. MWM - Water Mark, 10 %of cross sectional area

Observations (25)

DistanceCodeObservation
6.1TFA
420.4AMH22 0297
234.7TFA
417.2SAP
417.2MGOMAGNESIUM H.O. FINISH
292.5TFA
0AMH22 0296
0MWL
0MGOLATERAL AT MH 9 O'CLOCK ACTIVE
356.4TFA
207.5TFC
2.1SAP
116.9TFA
392.4TFC
0MWM
169.7TFA
67.4TFA
263TFA
2.1DAGS
331.2TFC
0.1VC
64TFC
137.2TFA
2.1MGOMAGNESIUM H.O. START
417.2DAGS

Properties (5)

additional_info
SC224612
custom_field_two
3
customer
LACSD
datetime
2015-12-29T23:22:11-08:00
sewer_category
GRAVITY