- Date
- 08/01/2016
- W/O
- 585991
- Weather
- Dry
- Operator/Surveyor
- J. HARTOOG
- Sewer ID
- Z00309
- PipeID
- P03920
- Time
- 11:22 PM
- Certificate
- 507-03-3386
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K3670
- Sewer Name
- 02 UNION PACIFIC TRUNK
- City
- COMMERCE, CA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 16
- Purpose
- Routine Assessment
- Project
- WO_585991_TV02189_AUG2016
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 15 in.
- Width
- 15 in.
- Upstream MH
- 02 1476
- Downstream MH
- 02 1475
- Dir. of Survey
- Downstream
- Length Surveyed
- 269 ft.
- Total Length
- 269 ft.
- Structural Index
- 2
- Structural Quick
- 3123
- Structural Rating
- 11
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 13
Pipe schematic from manhole 02 1476 to 02 1475 Observation photos (5)

0 ft. - General Observation - CONNECTION AT THE MH 3 O'CLOCK ACTIVE

0.1 ft. - General Observation - CONNECTION AT THE MH 9 O'CLOCK ACTIVE

3.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

186.1 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"

208.7 ft. - Crack Circumferential, from 06 to 09 o'clock, within 8 inches of joint: YES