05 0718_05 0717_20160113_031308_.mp4
2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
12.9 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES

16.6 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES
22.2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

59.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
114.8 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"
225.7 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
279.8 ft. - Roots Fine Joint, from 03 to 09 o'clock, within 8 inches of joint: NO, Start
| Distance | Code | Observation |
|---|---|---|
| 312.6 | FM | — |
| 0 | MWL | — |
| 311.3 | CM | — |
| 0 | AMH | 05 0718 |
| 114.8 | TBA | — |
| 0 | MWM | — |
| 311.3 | DAGS | — |
| 12.9 | RFJ | — |
| 279.8 | RFJ | — |
| 2.1 | DAGS | — |
| 316.6 | AMH | 05 0717 |
| 252.7 | RFJ | — |
| 22.2 | RFJ | — |
| 311.3 | RFJ | — |
| 225.7 | RFJ | — |
| 59.8 | CM | — |
| 16.6 | CL | — |