Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2016, 07:02 AM
  • 05 0726_05 0725_20160112_232429_.mp4

Date
01/12/2016
W/O
547108
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00521
PipeID
P05949
Time
11:02 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3113
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #1
City
INGLEWOOD, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
07
Purpose
Routine Assessment
Project
WO_547108_TV05104_JAN2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
05 0726
Downstream MH
05 0725
Dir. of Survey
Downstream
Length Surveyed
378 ft.
Total Length
378 ft.
Structural Index
4
Structural Quick
5143
Structural Rating
23
O&M Index
2
O&M Quick
4121
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole 05 0726 to 05 0725
MH: 05 0726MH: 05 0725downstream0 ft. MGO - General Observation - CONNECTION AT MH 5 OCLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 07264.5 ft. FM - Fracture Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES25.7 ft. CM - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES25.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start28.9 ft. FM - Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES31.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start62.3 ft. RFJ - Roots Fine Joint, from 08 to 09 o'clock, within 8 inches of joint: YES73.6 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start81.4 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish96.5 ft. RBL - Roots Ball Lateral, at 03 o'clock, 60 %96.5 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"113.4 ft. B - Broken, from 07 to 09 o'clock, within 8 inches of joint: YES160.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 6"223.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: NO, 4"283.6 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 4"336.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"338.3 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"373.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish378 ft. AMH - Downstream Manhole, Survey Ends - 05 0725378 ft. MGO - General Observation - CONNECTION AT MH 9 OCLOCK

Observation photos (11)

  • Water Mark, 20 %of cross sectional area

    0 ft. - Water Mark, 20 %of cross sectional area

  • Fracture Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

    4.5 ft. - Fracture Multiple, from 11 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

    25.7 ft. - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    25.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

    28.9 ft. - Fracture Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    31.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 09 o'clock, within 8 inches of joint: YES

    62.3 ft. - Roots Fine Joint, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    73.6 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Roots Ball Lateral, at 03 o'clock, 60 %

    96.5 ft. - Roots Ball Lateral, at 03 o'clock, 60 %

  • Broken, from 07 to 09 o'clock, within 8 inches of joint: YES

    113.4 ft. - Broken, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"

    338.3 ft. - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"

Observations (25)

DistanceCodeObservation
96.5RBL
25.7CM
283.6TFA
81.4FM
338.3TBA
0MGOCONNECTION AT MH 5 OCLOCK
223.1TFA
0MWM
0MWL
31.5CM
96.5TFA
73.6FM
378AMH05 0725
160.1TFA
373.2CM
0MGOCONNECTION AT MH 3 OCLOCK
375DAGS
62.3RFJ
378MGOCONNECTION AT MH 9 OCLOCK
113.4B
0AMH05 0726
336.9TFC
25.7DAGS
4.5FM
28.9FM

Properties (4)

additional_info
SC224495
custom_field_two
2
customer
LACSD
datetime
2016-01-12T23:02:00-08:00