C 0174_C 0173_5302017_122254.mp4
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
25.4 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Start
64.4 ft. - Surface Reinforcement Visible, from 10 to 04 o'clock, within 8 inches of joint: YES
74.9 ft. - General Photograph - REINFORCEMENT
74.9 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
81.4 ft. - General Observation - AGGREGATE
119.8 ft. - General Photograph - AGGREGATE/SPALLING
169 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES
201.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES
202.7 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES
250.4 ft. - Surface Reinforcement Visible, from 02 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 74.9 | MGP | REINFORCEMENT |
| 0 | AMH | 12:16 PM |
| 74.9 | SRV | — |
| 254.6 | SSS | — |
| 0 | MGO | ROACHES @ MH |
| 2 | SAV | — |
| 202.7 | SRV | — |
| 81.4 | MGO | AGGREGATE |
| 257.4 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 0 | MWM | — |
| 25.4 | SRV | — |
| 201.6 | DAGS | — |
| 119.8 | MGP | AGGREGATE/SPALLING |
| 254.6 | SRV | — |
| 257.4 | AMH | 12:57 PM |
| 0 | MWL | — |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 144.9 | MGP | SPALLING |
| 141 | TFA | — |
| 257.4 | MGO | Conn. @ Mh, 9 O' Clock. OPEN |
| 64.4 | SRV | — |
| 254.6 | SAV | — |
| 250.4 | SRV | — |
| 36.4 | SRV | — |
| 2 | SSS | — |
| 169 | SSS | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |