C 0173_C 0172_5302017_095521.mp4
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
60 ft. - Surface Reinforcement Visible, from 12 to 04 o'clock, within 8 inches of joint: YES
78.2 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: YES
112.3 ft. - Obstacles Pipe Material, 5 %of cross sectional area, from 01 to 02 o'clock - 2"
132.1 ft. - Surface Reinforcement Visible, from 01 to 04 o'clock, within 8 inches of joint: YES
149.4 ft. - General Observation - AGGREGATE
171.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES
212 ft. - General Photograph - REINFORCEMENT
212 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 132.1 | SRV | — |
| 112.3 | OBM | 2" |
| 0 | AMH | 9:24 AM |
| 112.3 | TFA | — |
| 2 | SAV | — |
| 253 | SSS | — |
| 0.1 | MGO | ROACHES @ MH |
| 253.1 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 253.1 | AMH | 11:40 AM |
| 171.5 | SRV | — |
| 60 | SRV | — |
| 212 | MGP | REINFORCEMENT |
| 2 | SRV | — |
| 149.4 | MGO | AGGREGATE |
| 253 | SAV | — |
| 2 | SSS | — |
| 0.1 | MWL | — |
| 0.1 | MWM | — |
| 253.1 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 78.2 | SRC | — |
| 253 | SRV | — |
| 212 | SRV | — |