C 0171_C 0170_5302017_083303.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
9.4 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - 11 O'CLOCK
27.2 ft. - General Observation - SPALLING/AGGREGATE
51.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: YES
73.8 ft. - Surface Reinforcement Visible, from 01 to 04 o'clock, within 8 inches of joint: YES
103.2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
113.4 ft. - General Photograph - RIB CAGE REINFORCEMENT
140.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: YES
173.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 140.5 | DAGS | — |
| 195.1 | SRC | — |
| 197.3 | MGO | ROACHES @ MH |
| 9.4 | SRV | 11 O'CLOCK |
| 197.3 | MGO | Conn. @ Mh, 5 O' Clock. Active |
| 173.6 | DAGS | — |
| 0.1 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 195.1 | SSS | — |
| 73.8 | SRV | — |
| 51.7 | DAGS | — |
| 27.2 | MGO | SPALLING/AGGREGATE |
| 197.3 | AMH | 9:11 AM |
| 2 | SSS | — |
| 103.2 | SRC | — |
| 0.1 | MWM | — |
| 0.1 | MWL | — |
| 195.1 | SAV | — |
| 197.3 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 0 | AMH | 8:20 AM |
| 2 | MGO | ROACHES @ MH |
| 113.4 | MGP | RIB CAGE REINFORCEMENT |
| 2 | SAV | — |