Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 5, 2016, 11:01 AM
  • 32 1036_32 1035_20160205_041431.mp4

Date
02/05/2016
W/O
547104
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19484
Time
3:01 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3094
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
05
Purpose
Routine Assessment
Project
WO_547104_TV32025_JAN2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
32 1036
Downstream MH
32 1035
Dir. of Survey
Downstream
Length Surveyed
366.2 ft.
Total Length
366.2 ft.
Structural Index
3
Structural Quick
3C21
Structural Rating
56
O&M Index
2
O&M Quick
2E00
O&M Rating
62
Overall Index
2
Overall Quick
Overall Rating
118
Pipe schematic from manhole 32 1036 to 32 1035
MH: 32 1036MH: 32 1035downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 10362 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start144.7 ft. CM - Crack Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES180 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES217.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start246.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES267.2 ft. CS - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES287.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY364.8 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish364.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish364.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish366.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1035

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES

    144.7 ft. - Crack Multiple, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    180 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    217.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    246.8 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    267.2 ft. - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY

    287.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY

Observations (14)

DistanceCodeObservation
217.5DAE
0MWL
0MWM
144.7CM
2DAGS
0AMH32 1036
287.5CMSPORADICALLY
364.8DAE
364.8CM
246.8CM
180CM
366.2AMH32 1035
364.8DAGS
267.2CS

Properties (5)

additional_info
SC225472
custom_field_two
3
customer
LACSD
datetime
2016-02-05T03:01:26-08:00
sewer_category
GRAVITY