Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2016, 07:51 AM
  • 32 1010_32 1009_20160210_010921.mp4

Date
02/09/2016
W/O
547104
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19458
Time
11:51 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3097
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
05
Purpose
Routine Assessment
Project
WO_547104_TV32025_JAN2016
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
32 1010
Downstream MH
32 1009
Dir. of Survey
Downstream
Length Surveyed
402 ft.
Total Length
402 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
237
O&M Index
2
O&M Quick
2O00
O&M Rating
162
Overall Index
2
Overall Quick
Overall Rating
399
Pipe schematic from manhole 32 1010 to 32 1009
MH: 32 1010MH: 32 1009downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 10100 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start5.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY400.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish400.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish400.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish402 ft. AMH - Downstream Manhole, Survey Ends - 32 1009

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    4.9 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY

    5.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SPORADICALLY

Observations (10)

DistanceCodeObservation
400.2CM
0AMH32 1010
0MWM
400.2DAGS
402AMH32 1009
2DAGS
4.9DAE
0MWL
5.4CMSPORADICALLY
400.2DAE

Properties (5)

additional_info
SC225475
custom_field_two
3
customer
LACSD
datetime
2016-02-09T23:51:47-08:00
sewer_category
GRAVITY