Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2017, 08:17 AM
  • 18 0376_18 0375_5242017_012201.mp4

Date
05/24/2017
W/O
0630165
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00690
PipeID
P14210
Time
1:17 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0530
Sewer Name
18 NORTH NORWALK TRUNK
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
25
Purpose
Capital Improvement Program Assesment
Project
20170522MDM_NORTH_NORWALK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
18 0376
Downstream MH
18 0375
Dir. of Survey
Downstream
Length Surveyed
207.5 ft.
Total Length
207.5 ft.
Structural Index
2
Structural Quick
372A
Structural Rating
43
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
43
Pipe schematic from manhole 18 0376 to 18 0375
MH: 18 0376MH: 18 0375downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 1:20AM6.5 ft. FC - Fracture Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES - SLIGHT6.5 ft. FC - Fracture Circumferential, from 02 to 03 o'clock, within 8 inches of joint: YES - SLIGHT11 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - SL11 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - SL15.1 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - SL15.1 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - HAIRLINE19 ft. FC - Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES - H23.1 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES - H27.1 ft. FC - Fracture Circumferential, from 09 to 12 o'clock, within 8 inches of joint: YES - H27.1 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - SL31.6 ft. FL - Fracture Longitudinal, at 09 TO 3 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS31.6 ft. FL - Fracture Longitudinal, at 09 TO 3 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS31.6 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS31.6 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS44.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped59 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H62.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish - H115.9 ft. MGO - General Observation - 15" VCP145.2 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped155.6 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SLIGHT167.9 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish - SL175.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H184.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish - H196.3 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H200.6 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish - H207 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - 60% HAIRLINE AT JOINTS207 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES, Finish - 30% SLIGHT AT JOINTS207 ft. FC - Fracture Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - 70% SLIGHT AT JOINTS207 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES, Finish - 30% HAIRLINE AT JOINTS207.5 ft. AMH - Downstream Manhole, Survey Ends - 1:55AM

Observation photos (5)

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H

    59 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H

  • General Observation - 15" VCP

    115.9 ft. - General Observation - 15" VCP

  • Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    155.6 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H

    175.9 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H

    196.3 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start - H

Observations (34)

DistanceCodeObservation
167.9FSSL
145.2TFCCapped
175.9FLH
31.6FLSLIGHT AT JOINTS
59FLH
11FCSL
19FCH
11FCSL
62.5FLH
6.5FCSLIGHT
0MWM
184.1FLH
155.6FSSLIGHT
27.1FCH
115.9MGO15" VCP
207.5AMH1:55AM
31.6FLHAIRLINE AT JOINTS
23.1FLH
15.1FCSL
27.1FCSL
15.1FCHAIRLINE
196.3FLH
0MWL
31.6FCSLIGHT AT JOINTS
207FC60% HAIRLINE AT JOINTS
31.6FCHAIRLINE AT JOINTS
207FL30% SLIGHT AT JOINTS
200.6FLH
6.5FCSLIGHT
207FC70% SLIGHT AT JOINTS
207FL30% HAIRLINE AT JOINTS
0MGOConn. @ Mh, 3 O' Clock. Active
44.1TFCCapped
0AMH1:20AM

Properties (4)

custom_field_three
HAIRLINE FRACTURE JOINT TO JOINT LONGER
custom_field_two
2
customer
LACSD
datetime
2017-05-24T01:17:59-07:00