Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 2, 2016, 12:30 PM
  • 29 0354_29 0353_20020101_075406.mp4

Date
03/02/2016
W/O
557696
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01017
PipeID
P24374
Time
4:30 AM
Certificate
U507033386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3215
Sewer Name
29 PACIFIC COAST HIGHWAY SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_557696_TV29045_2016MAR
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0354
Downstream MH
29 0353
Dir. of Survey
Downstream
Length Surveyed
294.4 ft.
Total Length
294.4 ft.
Structural Index
2
Structural Quick
3121
Structural Rating
6
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
10
Pipe schematic from manhole 29 0354 to 29 0353
MH: 29 0354MH: 29 0353downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 03540 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 5 %of cross sectional area5.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"52.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"55.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"108.8 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"112.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"152.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"156 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"170 ft. JOM - Joint Offset Medium171.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"206.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"209.4 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"236.3 ft. MWLS - Water Level, Sag in pipe, 20 %of cross sectional area237.8 ft. CM - Crack Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES237.8 ft. RFB - Roots Fine Barrell, from 01 to 03 o'clock, within 8 inches of joint: NO254.2 ft. MGO - General Observation - END SAG259.1 ft. TBC - Tap Break-In Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"262.6 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"294.4 ft. AMH - Downstream Manhole, Survey Ends - 29 0353

Observation photos (3)

  • Joint Offset Medium

    170 ft. - Joint Offset Medium

  • Crack Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

    237.8 ft. - Crack Multiple, from 01 to 05 o'clock, within 8 inches of joint: YES

  • Roots Fine Barrell, from 01 to 03 o'clock, within 8 inches of joint: NO

    237.8 ft. - Roots Fine Barrell, from 01 to 03 o'clock, within 8 inches of joint: NO

Observations (21)

DistanceCodeObservation
171.6TFA
237.8CM
0AMH29 0354
55.7TFC
294.4AMH29 0353
236.3MWLS
209.4TFC
112.3TFC
52.2TFC
262.6TFC
108.8TFC
237.8RFB
0MWL
254.2MGOEND SAG
0MWM
152.5TFC
5.8TFC
259.1TBC
156TFC
206.1TFC
170JOM

Properties (5)

additional_info
SC305304
custom_field_two
4
customer
LACSD
datetime
2016-03-02T04:30:00-08:00
sewer_category
GRAVITY