Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 19, 2017, 04:39 PM
  • 05 A 0535_05 A 0534_5192017_101102.mp4

Date
05/19/2017
W/O
0618889
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00315
PipeID
P07772
Time
9:39 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7410
Sewer Name
A JOA-1A DISTRICT 5 INTERCEPTOR
City
LAWNDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
17
Purpose
Routine Assessment
Project
20170518DF_JOA_1A_DISTRICT_5_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Upstream MH
05 A 0534
Downstream MH
05 A 0535
Dir. of Survey
Upstream
Length Surveyed
14.7 ft.
Total Length
14.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 05 A 0534 to 05 A 0535
MH: 05 A 0534MH: 05 A 0535upstream0 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - DEBRIS0 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish12.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.7 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start12.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.7 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start14.7 ft. MWL - Water Level, 15 %of cross sectional area14.7 ft. AMH - Downstream Manhole, Survey Begins - 10:00 AM14.7 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Ragging, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Ragging, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
2SSS
2DAR
0MWL
2SAV
14.7DAGS
14.7MSADEBRIS
14.7DAR
2DAGS
14.7SSS
0AMH10:00 AM
0MWM
14.7SAV

Properties (3)

custom_field_two
5
customer
LACSD
datetime
2017-05-19T09:39:43-07:00