- Date
- 03/22/2016
- W/O
- 557858
- Weather
- Dry
- Operator/Surveyor
- J. HARTOOG
- Sewer ID
- Z00699
- PipeID
- P14264
- Time
- 10:41 PM
- Certificate
- U-507-03-3386
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K3232
- Sewer Name
- 18 SANTA FE STREET RELIEF TRUNK
- City
- WHITTIER, CA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 18
- Page No.
- 21
- Purpose
- Routine Assessment
- Project
- WO_557858_TV18044_2016MAR
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 21 in.
- Upstream MH
- 18 1098
- Downstream MH
- 18 1097
- Dir. of Survey
- Downstream
- Length Surveyed
- 125.8 ft.
- Total Length
- 125.8 ft.
- Structural Index
- 3
- Structural Quick
- 3200
- Structural Rating
- 6
- O&M Index
- 2
- O&M Quick
- 2D00
- O&M Rating
- 46
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 52
Pipe schematic from manhole 18 1098 to 18 1097 Observation photos (3)

0 ft. - Water Mark, 40 %of cross sectional area

3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

7.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start