18 0404_18 0403_20160321_232526.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2 ft. - General Observation - MAGNEZIUM H.O. START 30%
7.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
108.3 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
172.3 ft. - Repair Localized Liner, within 8 inches of joint: YES - LINER

182.3 ft. - Surface Aggregate Projecting Chemical, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
182.3 ft. - Roots Fine Joint, at 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 416.5 | SAPC | — |
| 2 | DAGS | — |
| 7.5 | SSS | — |
| 182.3 | SAPC | — |
| 0 | MWL | — |
| 165.9 | RFJ | — |
| 0 | MWM | — |
| 0 | AMH | 18 0404 |
| 2 | MGO | MAGNEZIUM H.O. START 30% |
| 416.5 | SSS | — |
| 416.5 | DAGS | — |
| 419.8 | AMH | 18 0403 |
| 172.3 | RPL | LINER |
| 182.3 | RFJ | — |
| 108.3 | TBA | — |