Wastewater/Activity/PacpInspection/1.0Mar 13, 2017, 08:41 AM
  • J 0389_J 0074_3132017_022221.mp4

Date
03/13/2017
W/O
0613633
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00063
PipeID
P11654
Time
1:41 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0464
Sewer Name
J JOINT OUTFALL J - UNIT 2D
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
31
Purpose
Capital Improvement Program Assesment
Project
20170313MDM_JOINT_OUTFALL_J_UNIT_2D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
J 0389
Downstream MH
J 0074
Dir. of Survey
Downstream
Length Surveyed
866.6 ft.
Total Length
866.6 ft.
Structural Index
3
Structural Quick
5136
Structural Rating
27
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
27
Pipe schematic from manhole J 0389 to J 0074
MH: J 0389MH: J 0074downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:55AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 50% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE FLAKING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT15.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG27.2 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG47 ft. SAP - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG184.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG210.3 ft. SRV - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR296.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active305.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG468.2 ft. MGO - General Observation - MAG COAT 60% START613.9 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE620.9 ft. MGO - General Observation - MAG COAT 25% START850 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG866.3 ft. MGO - General Observation - MAG COAT 25% FINISH866.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG866.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING PEELING CONCRETE866.6 ft. AMH - Downstream Manhole, Survey Ends - 2:55AM

Observation photos (12)

  • General Observation - MAG COAT 50% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 50% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE FLAKING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING CONCRETE FLAKING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    15.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    27.2 ft. - Surface Aggregate Projecting, from 03 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    184.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

    210.3 ft. - Surface Reinforcement Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    305.3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - MAG COAT 60% START

    468.2 ft. - General Observation - MAG COAT 60% START

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    613.9 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • General Observation - MAG COAT 25% START

    620.9 ft. - General Observation - MAG COAT 25% START

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    850 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (21)

DistanceCodeObservation
0MWM
305.3SAVSEVERE AGG
0AMH1:55AM
866.3MGOMAG COAT 25% FINISH
0MWL
866.6AMH2:55AM
47SAPSEVERE AGG
210.3SRVCIRCUM REBAR
2MGOMAG COAT 50% START 8:00 TO 4:00
866.3SAVSEVERE AGG
613.9SSSPEELING CONCRETE
15.4SAVSEVERE AGG
620.9MGOMAG COAT 25% START
2SSSBLISTERING CONCRETE FLAKING CONCRETE
2SAVSEVERE AGG UNDER MAG COAT
27.2SAPSEVERE AGG
866.3SSSBLISTERING FLAKING PEELING CONCRETE
296.2TFActive
850SAVSEVERE AGG
468.2MGOMAG COAT 60% START
184.7SAVSEVERE AGG

Properties (4)

custom_field_three
SEVERE AGG PROJECTING -1 CIRCUM REBAR SMALL
custom_field_two
3
customer
LACSD