Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2015, 09:03 AM
  • B 0707_B 0706_20151217_012051.mp4

Date
12/17/2015
W/O
542022
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00110
PipeID
P09380
Time
1:03 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2935
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_542022_TV22067_DEC2015
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
B 0707
Downstream MH
B 0706
Dir. of Survey
Downstream
Length Surveyed
273.8 ft.
Total Length
273.8 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
1200
O&M Rating
2
Overall Index
1
Overall Quick
Overall Rating
2
Pipe schematic from manhole B 0707 to B 0706
MH: B 0707MH: B 0706downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 07070 ft. MGO - General Observation - CONNECTION AT THE MH 3 O' CLOCK0 ft. VC - Vermin Cockroach2 ft. MGO - General Observation - Magnesium hydroxide coating 60% start37.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"58.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"100.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"136.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"154.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"210.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"271.1 ft. MGO - General Observation - Magnesium hydroxide coating 60% finish273.8 ft. VC - Vermin Cockroach273.8 ft. AMH - Downstream Manhole, Survey Ends - B 0706

Observations (15)

DistanceCodeObservation
0MWM
0MWL
136.4TF
210.7TF
273.8VC
154.5TFA
37.9TFC
100.1TFC
0AMHB 0707
271.1MGOMagnesium hydroxide coating 60% finish
0MGOCONNECTION AT THE MH 3 O' CLOCK
273.8AMHB 0706
58.5TFC
0VC
2MGOMagnesium hydroxide coating 60% start

Properties (5)

additional_info
SC207040
custom_field_two
4
customer
LACSD
datetime
2015-12-17T01:03:14-08:00
sewer_category
GRAVITY