Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 16, 2015, 11:00 AM
  • B 0716_B 0715_20151216_033831.mp4

Date
12/16/2015
W/O
542022
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00110
PipeID
P09390
Time
3:00 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2934
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_542022_TV22067_DEC2015
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
B 0716
Downstream MH
B 0715
Dir. of Survey
Downstream
Length Surveyed
399.3 ft.
Total Length
399.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
1
O&M Quick
1200
O&M Rating
2
Overall Index
1
Overall Quick
Overall Rating
2
Pipe schematic from manhole B 0716 to B 0715
MH: B 0716MH: B 0715downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - B 07160 ft. MGO - General Observation - CONNECTION AT THE MH 9 O' CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - Magnesium hydroxide coating 70% start23.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"26.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"73.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"76.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"124.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"127.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"172.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"175.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"219.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"222.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"273.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"276.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"324.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"371.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"396.8 ft. MGO - General Observation - Magnesium hydroxide coating 70% finish399.3 ft. VC - Vermin Cockroach399.3 ft. MGO - General Observation - CONNECTION AT THE MH 9 O' CLOCK399.3 ft. AMH - Downstream Manhole, Survey Ends - B 0715

Observations (24)

DistanceCodeObservation
76.7TFC
2MGOMagnesium hydroxide coating 70% start
175.2TFC
0MWM
124.3TFC
26.3TFC
219.5TFC
127.3TFC
222.9TFA
0VC
0AMHB 0716
273.6TFC
73.8TFC
396.8MGOMagnesium hydroxide coating 70% finish
399.3VC
371.8TFC
23.3TFC
0MGOCONNECTION AT THE MH 9 O' CLOCK
276.6TFC
324.4TFA
399.3MGOCONNECTION AT THE MH 9 O' CLOCK
0MWL
399.3AMHB 0715
172.3TFA

Properties (5)

additional_info
SC207039
custom_field_two
4
customer
LACSD
datetime
2015-12-16T03:00:18-08:00
sewer_category
GRAVITY