Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2015, 09:07 AM
  • A 0598_A 0597_20151223_014610.mp4

Date
12/23/2015
W/O
541844
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00316
PipeID
P07803
Time
1:07 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3017
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
WO_541844_TV21027_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
66 in.
Upstream MH
A 0598
Downstream MH
A 0597
Dir. of Survey
Downstream
Length Surveyed
770.7 ft.
Total Length
770.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole A 0598 to A 0597
MH: A 0598MH: A 0597downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 05986 ft. MGO - General Observation - MAGNESIUM H.O. START6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start765.1 ft. MGO - General Observation - MAGNESIUM H.O. FINISH765.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish765.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish770.7 ft. AMH - Downstream Manhole, Survey Ends - A 0597

Observation photos (3)

  • General Observation - MAGNESIUM H.O. START

    6 ft. - General Observation - MAGNESIUM H.O. START

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
6MGOMAGNESIUM H.O. START
6DAGS
6SAP
0MWM
765.1MGOMAGNESIUM H.O. FINISH
0MWL
765.1DAGS
770.7AMHA 0597
0AMHA 0598
765.1SAP

Properties (5)

additional_info
SC224609
custom_field_two
3
customer
LACSD
datetime
2015-12-23T01:07:16-08:00
sewer_category
GRAVITY