Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 22, 2015, 11:27 AM
  • A 0603_A 0602_20151222_035840.mp4

Date
12/22/2015
W/O
541844
Weather
Light Rain
Operator/Surveyor
R.VARGAS
Sewer ID
Z00316
PipeID
P07808
Time
3:27 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3016
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
37
Purpose
Routine Assessment
Project
WO_541844_TV21027_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Upstream MH
A 0603
Downstream MH
A 0602
Dir. of Survey
Downstream
Length Surveyed
692.1 ft.
Total Length
692.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2114
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole A 0603 to A 0602
MH: A 0603MH: A 0602downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06036 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6 ft. MGO - General Observation - MAGNESIUM H.O. START368.7 ft. VC - Vermin Cockroach441.6 ft. LR - Alignment Right, 10 %466.7 ft. LL - Alignment Left, 10 %559.3 ft. VC - Vermin Cockroach686.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish686.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish686.4 ft. MGO - General Observation - MAGNESIUM H.O. FINISH692.1 ft. AMH - Downstream Manhole, Survey Ends - A 0602

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAGNESIUM H.O. START

    6 ft. - General Observation - MAGNESIUM H.O. START

Observations (14)

DistanceCodeObservation
686.4DAGS
6SAP
0MWM
686.4SAP
559.3VC
686.4MGOMAGNESIUM H.O. FINISH
466.7LL
6DAGS
0MWL
6MGOMAGNESIUM H.O. START
368.7VC
441.6LR
0AMHA 0603
692.1AMHA 0602

Properties (5)

additional_info
SC224608
custom_field_two
3
customer
LACSD
datetime
2015-12-22T03:27:36-08:00
sewer_category
GRAVITY