Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2015, 08:37 AM
  • A 0639_A 0638_20151217_010718.mp4

Date
12/17/2015
W/O
541844
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00316
PipeID
P07844
Time
12:37 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3012
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
34
Purpose
Routine Assessment
Project
WO_541844_TV21027_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
45 in.
Upstream MH
A 0639
Downstream MH
A 0638
Dir. of Survey
Downstream
Length Surveyed
977 ft.
Total Length
977 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole A 0639 to A 0638
MH: A 0639MH: A 0638downstream0 ft. AMH - Upstream Manhole, Survey Begins - A 06390 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area2.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.8 ft. MGO - General Observation - MAGNESIUM H.O. START2.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start233.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"624.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"693.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"957.1 ft. VC - Vermin Cockroach957.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"972.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish972.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish972.3 ft. MGO - General Observation - MAGNESIUM H.O. FINISH977 ft. AMH - Downstream Manhole, Survey Ends - A 0638977 ft. MGO - General Observation - AIR VENT AT MH

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNESIUM H.O. START

    2.8 ft. - General Observation - MAGNESIUM H.O. START

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
2.8SAP
957.1VC
972.3DAGS
957.1TFA
693.1TFA
624.2TFA
0AMHA 0639
977AMHA 0638
977MGOAIR VENT AT MH
0MWM
0MWL
972.3SAP
2.8MGOMAGNESIUM H.O. START
2.8DAGS
972.3MGOMAGNESIUM H.O. FINISH
233.3TFA

Properties (5)

additional_info
SC224605
custom_field_two
3
customer
LACSD
datetime
2015-12-17T00:37:21-08:00
sewer_category
GRAVITY