Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2015, 05:50 AM
  • A 0633_A 0632_20151217_221345.mp4

Date
12/17/2015
W/O
541844
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00316
PipeID
P07838
Time
9:50 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3013
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
34
Purpose
Routine Assessment
Project
WO_541844_TV21027_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Upstream MH
A 0633
Downstream MH
A 0632
Dir. of Survey
Downstream
Length Surveyed
547.5 ft.
Total Length
547.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole A 0633 to A 0632
MH: A 0633MH: A 0632downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06330 ft. MWM - Water Mark, 25 %of cross sectional area6 ft. MGO - General Observation - MAGNESIUM H.O. START6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start543.3 ft. MGO - General Observation - MAGNESIUM H.O. FINISH543.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish543.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish543.3 ft. VC - Vermin Cockroach547.5 ft. MGO - General Observation - AIR VENT AT MH547.5 ft. AMH - Downstream Manhole, Survey Ends - A 0632

Observation photos (3)

  • General Observation - MAGNESIUM H.O. START

    6 ft. - General Observation - MAGNESIUM H.O. START

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
6MGOMAGNESIUM H.O. START
0MWL
543.3MGOMAGNESIUM H.O. FINISH
543.3SAP
547.5MGOAIR VENT AT MH
6SAP
0AMHA 0633
6DAGS
543.3DAGS
547.5AMHA 0632
0MWM
543.3VC

Properties (5)

additional_info
SC224606
custom_field_two
3
customer
LACSD
datetime
2015-12-17T21:50:58-08:00
sewer_category
GRAVITY