Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 16, 2015, 06:42 AM
  • A 0651_A 0650_20151215_231605.mp4

Date
12/15/2015
W/O
541844
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00316
PipeID
P07858
Time
10:42 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3011
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
WO_541844_TV21027_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
A 0651
Downstream MH
A 0650
Dir. of Survey
Downstream
Length Surveyed
947.1 ft.
Total Length
947.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole A 0651 to A 0650
MH: A 0651MH: A 0650downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06516 ft. MGO - General Observation - MAGNESIUM H.O. START6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start49.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"942.7 ft. MGO - General Observation - MAGNESIUM H.O. FINISH943.1 ft. VC - Vermin Cockroach943.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish943.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish947.1 ft. AMH - Downstream Manhole, Survey Ends - A 0650947.1 ft. MGO - General Observation - AIR VENT AT MH947.1 ft. MGO - General Observation - CCTV FOOTAGE DIFFERENT FROM SPREAD SHEET WHEEL WALK FOOTAGE

Observation photos (3)

  • General Observation - MAGNESIUM H.O. START

    6 ft. - General Observation - MAGNESIUM H.O. START

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
942.7MGOMAGNESIUM H.O. FINISH
947.1AMHA 0650
947.1MGOAIR VENT AT MH
943.1VC
943.1SAP
49.6TFA
943.1DAGS
0MWM
0MWL
6MGOMAGNESIUM H.O. START
947.1MGOCCTV FOOTAGE DIFFERENT FROM SPREAD SHEET WHEEL WALK FOOTAGE
0AMHA 0651
6SAP
6DAGS

Properties (5)

additional_info
SC224604
custom_field_two
3
customer
LACSD
datetime
2015-12-15T22:42:37-08:00
sewer_category
GRAVITY