Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2015, 06:01 AM
  • A 0661_A 0660_20151214_223859.mp4

Date
12/14/2015
W/O
541844
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00316
PipeID
P07870
Time
10:01 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3010
Sewer Name
A JOA-1A DISTRICT 21 INTERCEPTOR
City
ROWLAND HEIGHTS
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
35
Purpose
Routine Assessment
Project
WO_541844_TV21027_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
A 0661
Downstream MH
A 0660
Dir. of Survey
Downstream
Length Surveyed
940.1 ft.
Total Length
940.1 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole A 0661 to A 0660
MH: A 0661MH: A 0660downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 06616.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. MGO - General Observation - MAGNESIUM H.O. START203.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"936.4 ft. MGO - General Observation - MAGNESIUM H.O. FINISH936.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish936.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish940.1 ft. AMH - Downstream Manhole, Survey Ends - A 0660

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAGNESIUM H.O. START

    6.1 ft. - General Observation - MAGNESIUM H.O. START

Observations (11)

DistanceCodeObservation
6.1DAGS
936.9DAGS
203.9TFA
936.4MGOMAGNESIUM H.O. FINISH
0MWL
940.1AMHA 0660
6.1SAP
936.9SAP
0MWM
0AMHA 0661
6.1MGOMAGNESIUM H.O. START

Properties (5)

additional_info
SC224603
custom_field_two
3
customer
LACSD
datetime
2015-12-14T22:01:17-08:00
sewer_category
GRAVITY