Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 17, 2017, 08:31 AM
  • J 0061_J 0060_3172017_020920.mp4

Date
03/17/2017
W/O
0613634
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00063
PipeID
P11639
Time
1:31 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0466
Sewer Name
J JOINT OUTFALL J - UNIT 2D
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
20170317MDM_JOINT_OUTFALL_J_UNIT_2D
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Upstream MH
J 0061
Downstream MH
J 0060
Dir. of Survey
Downstream
Length Surveyed
540.5 ft.
Total Length
540.5 ft.
Structural Index
3
Structural Quick
5135
Structural Rating
30
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole J 0061 to J 0060
MH: J 0061MH: J 0060downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:15AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 50% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING ,PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC26.7 ft. SAV - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG48.3 ft. MGO - General Observation - MAG COAT 25% START62.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE84.2 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR120.5 ft. MGO - General Observation - MAG COAT 50% START120.5 ft. SAV - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO134.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE139 ft. SAV - Surface Aggregate Visible, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG156.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES219.6 ft. MGO - General Observation - 30% MAG COAT START219.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active379.6 ft. MGO - General Observation - MAG COAT 70% START379.6 ft. SAV - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG388.5 ft. MGO - General Observation - MAG COAT 25% START505.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES540.1 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Capped540.1 ft. MGO - General Observation - MAG COAT 25% FINISH540.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG540.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING,PEELING CONCRETE540.5 ft. AMH - Downstream Manhole, Survey Ends - 3:10AM

Observation photos (13)

  • General Observation - MAG COAT 50% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 50% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING ,PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING ,PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    26.7 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • General Observation - MAG COAT 25% START

    48.3 ft. - General Observation - MAG COAT 25% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    62.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR

    84.2 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES - LONG REBAR

  • Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO

    120.5 ft. - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    134.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

    139 ft. - Surface Aggregate Visible, from 08 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    156.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    379.6 ft. - Surface Aggregate Visible, from 08 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    505.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (26)

DistanceCodeObservation
120.5MGOMAG COAT 50% START
48.3MGOMAG COAT 25% START
134.7SSSPEELING CONCRETE
120.5SAV
2MGOMAG COAT 50% START 8:00 TO 4:00
84.2SRVLONG REBAR
2SSSBLISTERING ,PEELING CONCRETE
139SAVSEVERE AGG
379.6MGOMAG COAT 70% START
540.1MGOConn. @ Mh, 3 O' Clock. Capped
156.1SSS
0AMH2:15AM
26.7SAVSEVERE AGG
540.1MGOMAG COAT 25% FINISH
388.5MGOMAG COAT 25% START
0MWM
540.1SAVSEVERE AGG
540.5AMH3:10AM
505.4SSS
540.1SSSBLISTERING,PEELING CONCRETE
219.6MGO30% MAG COAT START
0MWL
62.7SSSPEELING CONCRETE
219.6TFActive
379.6SAVSEVERE AGG
2SAVSEVERE AGG SPORATIC

Properties (4)

custom_field_three
SEVERE AGG VISIBLE-1 LONG REBAR
custom_field_two
3
customer
LACSD
datetime
2017-03-17T01:31:03-07:00