Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 5, 2017, 05:20 PM
  • 05 1115_05 1114_552017_103125.mp4

Date
05/05/2017
W/O
0630075
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00489
PipeID
P06350
Time
10:20 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7398
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 2
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
18
Purpose
Routine Assessment
Project
20170505MI_MONETA_EXTENSION_TRUNK_SECTION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
05 1115
Downstream MH
05 1114
Dir. of Survey
Downstream
Length Surveyed
366.8 ft.
Total Length
366.8 ft.
Structural Index
3
Structural Quick
3724
Structural Rating
29
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
37
Pipe schematic from manhole 05 1115 to 05 1114
MH: 05 1115MH: 05 1114downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:27 AM0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area8.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.4 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES10.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"22.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start35.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES81.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES132.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES188.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES189.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"202.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES243.7 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES248.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES293.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES294.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO298 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"319.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES350.2 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES355.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES365.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish365.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish366.8 ft. AMH - Downstream Manhole, Survey Ends - 11:00 AM

Observation photos (6)

  • Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    9.4 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    22.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    81.7 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES

    188.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    202.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 11:00 AM

    366.8 ft. - Downstream Manhole, Survey Ends - 11:00 AM

Observations (24)

DistanceCodeObservation
189.7TFA
298TBA
365.7SSS
81.7CM
243.7CL
0AMH10:27 AM
294.7DAGS
8.6SSS
10.6TFA
188.6DAGS
350.2CL
366.8AMH11:00 AM
132.6CM
355.5CM
202.9CM
9.4DAGS
0MWL
293.8CM
0MWM
22.2DAGS
365.7DAGS
35.9CL
319.8CM
248.5CM

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-05-05T10:20:38-07:00