Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 23, 2015, 09:23 AM
  • 14 0419_14 0418_23122015_012330.mp4

Date
12/23/2015
W/O
541758
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18502
Time
1:23 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3057
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_541758_TV14019_DEC2015
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0419
Downstream MH
14 0418
Dir. of Survey
Downstream
Length Surveyed
310 ft.
Total Length
310 ft.
Structural Index
3
Structural Quick
3K2I
Structural Rating
279
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
2
Overall Quick
Overall Rating
401
Pipe schematic from manhole 14 0419 to 14 0418
MH: 14 0419MH: 14 0418downstream0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04192 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start17.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"22 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start42.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"66.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"90.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"119.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"143.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"192.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"216.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"244.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"268.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"292.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"307.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish307.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish307.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish310 ft. AMH - Downstream Manhole, Survey Ends - 14 0418

Observation photos (2)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    22 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
307.7SSS
307.7SAP
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
310AMH14 0418
119.3TFC
0MWM
17.5TFC
143.8TFC
244.4TFC
292.9TFC
2SAP
66.7TFC
268.7TFC
307.7DAGS
42.5TFC
90.9TFC
216.3TFC
0MWL
0AMH14 0419
192.2TFC
2DAGS
22SSS

Properties (5)

additional_info
SC204196
custom_field_two
2
customer
LACSD
datetime
2015-12-23T01:23:27-08:00
sewer_category
GRAVITY