14 0432_14 0431A_24122015_003944.mp4
2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
2.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
4.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
22.1 ft. - Material Change, Vitrified clay pipe
32.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
32.4 ft. - Material Change, Concrete pipe (non-reinfored)
32.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
185.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES
190.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 22.1 | SAP | — |
| 2.2 | DAGS | — |
| 2.2 | SAP | — |
| 206.1 | SSS | — |
| 85.3 | TFC | — |
| 185.4 | TFA | — |
| 134.1 | TFC | — |
| 24.7 | TBA | — |
| 206.1 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 60.5 | TFC | — |
| 206.2 | AMH | 14 0431A |
| 22.1 | MMC | — |
| 4.6 | SSS | — |
| 190.2 | DSZ | — |
| 0 | MWL | — |
| 0 | AMH | 14 0432 |
| 185.4 | DAGS | — |
| 206.1 | DAGS | — |
| 206.1 | SAP | — |
| 32.4 | SSS | — |
| 206.1 | DSZ | — |
| 32.4 | MMC | — |
| 32.4 | SAP | — |
| 22.1 | SSS | — |
| 158.5 | TFC | — |