Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 24, 2015, 08:39 AM
  • 14 0432_14 0431A_24122015_003944.mp4

Date
12/24/2015
W/O
541758
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00578
PipeID
P18517
Time
12:39 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3058
Sewer Name
14 TRUNK "B"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_541758_TV14019_DEC2015
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
14 0432
Downstream MH
14 0431A
Dir. of Survey
Downstream
Length Surveyed
206.2 ft.
Total Length
206.2 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
2H00
O&M Rating
90
Overall Index
2
Overall Quick
Overall Rating
285
Pipe schematic from manhole 14 0432 to 14 0431A
MH: 14 0432MH: 14 0431Adownstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04322.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start4.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start22.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish22.1 ft. MMC - Material Change, Vitrified clay pipe22.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish24.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"32.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start32.4 ft. MMC - Material Change, Concrete pipe (non-reinfored)32.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start60.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"134.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"158.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"185.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"185.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES190.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start206.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish206.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK206.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish206.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish206.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish206.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0431A

Observation photos (9)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Vitrified clay pipe

    22.1 ft. - Material Change, Vitrified clay pipe

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    32.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Material Change, Concrete pipe (non-reinfored)

    32.4 ft. - Material Change, Concrete pipe (non-reinfored)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    32.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES

    185.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    190.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
0MWM
22.1SAP
2.2DAGS
2.2SAP
206.1SSS
85.3TFC
185.4TFA
134.1TFC
24.7TBA
206.1MGOACTIVE CONNECTION AT MH 9 O'CLOCK
60.5TFC
206.2AMH14 0431A
22.1MMC
4.6SSS
190.2DSZ
0MWL
0AMH14 0432
185.4DAGS
206.1DAGS
206.1SAP
32.4SSS
206.1DSZ
32.4MMC
32.4SAP
22.1SSS
158.5TFC

Properties (5)

additional_info
SC204197
custom_field_two
2
customer
LACSD
datetime
2015-12-24T00:39:24-08:00
sewer_category
GRAVITY