- Date
- 05/03/2017
- W/O
- 0624373
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00107
- PipeID
- P09293
- Time
- 3:13 AM
- Certificate
- U-1-14-06O22543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0514
- Sewer Name
- B JOINT OUTFALL B - UNIT 8D
- City
- TEMPLE CITY
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 15
- Page No.
- 11
- Purpose
- Routine Assessment
- Project
- 20170503MDM_JOINT_OUTFALL_B_UNIT_8D
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 27 in.
- Upstream MH
- B 0628
- Downstream MH
- B 0627
- Dir. of Survey
- Downstream
- Length Surveyed
- 250.9 ft.
- Total Length
- 250.9 ft.
- Structural Index
- 2
- Structural Quick
- 2300
- Structural Rating
- 6
- O&M Index
- 4
- O&M Quick
- 4100
- O&M Rating
- 4
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 10
Pipe schematic from manhole B 0628 to B 0627 Observation photos (4)

2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN,FLAKING CONCRETE

2 ft. - General Observation - MAG COAT 80% START 9:00 TO 4:00

132.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - SWOLLEN,FLAKING CONCRETE

227 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO