Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 1, 2017, 04:06 PM
  • 05 1126_05 1125_512017_091222.mp4

Date
05/01/2017
W/O
0630075
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00489
PipeID
P06362
Time
9:06 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7392
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 2
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
20170427MI_MONETA_EXTENSION_TRUNK_SECTION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
05 1125
Downstream MH
05 1126
Dir. of Survey
Upstream
Length Surveyed
341.8 ft.
Total Length
341.8 ft.
Structural Index
3
Structural Quick
5141
Structural Rating
20
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole 05 1125 to 05 1126
MH: 05 1125MH: 05 1126upstream0 ft. AMH - Upstream Manhole, Survey Ends - 09:45 AM1.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish5.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"11 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"15.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES60.2 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"66.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES114.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.3 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"168.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"172.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"218.2 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"221.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"267.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"272.6 ft. B - Broken, from 07 to 09 o'clock, within 8 inches of joint: YES272.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"323.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES333.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start337.8 ft. FM - Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES341.8 ft. AMH - Downstream Manhole, Survey Begins - 09:15 AM341.8 ft. MGO - General Observation - CONNECTION AT MH, 3 OCLOCK, ACTIVE341.8 ft. MWM - Water Mark, 40 %of cross sectional area341.8 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (7)

  • Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES

    4 ft. - Fracture Multiple, from 04 to 08 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    17.9 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Broken, from 07 to 09 o'clock, within 8 inches of joint: YES

    69.2 ft. - Broken, from 07 to 09 o'clock, within 8 inches of joint: YES

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    123.6 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    339.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

  • Upstream Manhole, Survey Ends - 09:45 AM

    341.8 ft. - Upstream Manhole, Survey Ends - 09:45 AM

Observations (24)

DistanceCodeObservation
0AMH09:15 AM
8SSS
273.3CM
341.8AMH09:45 AM
330.8TBA
0MGOCONNECTION AT MH, 3 OCLOCK, ACTIVE
123.6TBA
4FM
336.1TBA
275.3TBA
222.5TBA
0MWM
69TFA
69.2B
339.9SSS
173.4TFA
74.2TFA
226.9TBA
17.9CM
281.6TB
0MWL
120.2TFA
169.3TBA
326.3CM

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-05-01T09:06:25-07:00