Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 28, 2017, 03:45 PM
  • 05 1128_05 1127_4282017_130228.mp4

Date
04/28/2017
W/O
0630075
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00489
PipeID
P06364
Time
8:45 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7392
Sewer Name
05 MONETA EXTENSION TRUNK, SECTION 2
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
14
Purpose
Routine Assessment
Project
20170427MI_MONETA_EXTENSION_TRUNK_SECTION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
05 1128
Downstream MH
05 1127
Dir. of Survey
Downstream
Length Surveyed
341.8 ft.
Total Length
341.8 ft.
Structural Index
3
Structural Quick
5243
Structural Rating
63
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
67
Pipe schematic from manhole 05 1128 to 05 1127
MH: 05 1128MH: 05 1127downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 OCLOCK, ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 01:00 PM0 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE3.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES14 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES63.1 ft. B - Broken, from 12 to 06 o'clock, within 8 inches of joint: YES64.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open67.7 ft. CM - Crack Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES68.8 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: NO, 6"71 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES116.6 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES118 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE122 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open129 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES141.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES167.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"169.6 ft. FM - Fracture Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES170.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open198.6 ft. CM - Crack Multiple, from 12 to 06 o'clock, within 8 inches of joint: YES218.2 ft. B - Broken, from 03 to 06 o'clock, within 8 inches of joint: YES218.2 ft. FM - Fracture Multiple, from 12 to 06 o'clock, within 8 inches of joint: YES219.5 ft. TBA - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"222.5 ft. FM - Fracture Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES224 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open263.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES271.2 ft. CM - Crack Multiple, from 12 to 06 o'clock, within 8 inches of joint: YES273.2 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"276.2 ft. CM - Crack Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES277.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open326.7 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"330.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Open333.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES340.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES340.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish340.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish341.8 ft. AMH - Downstream Manhole, Survey Ends - 01:47 PM

Observation photos (15)

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    3.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    14 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Broken, from 12 to 06 o'clock, within 8 inches of joint: YES

    63.1 ft. - Broken, from 12 to 06 o'clock, within 8 inches of joint: YES

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open

    64.6 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Open

  • Crack Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES

    67.7 ft. - Crack Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES

    169.6 ft. - Fracture Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES

  • Broken, from 03 to 06 o'clock, within 8 inches of joint: YES

    218.2 ft. - Broken, from 03 to 06 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 12 to 06 o'clock, within 8 inches of joint: YES

    218.2 ft. - Fracture Multiple, from 12 to 06 o'clock, within 8 inches of joint: YES

  • Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"

    219.5 ft. - Tap Break-In Active, at 01 o'clock, -, within 8 inches of joint: NO, 6"

  • Fracture Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES

    222.5 ft. - Fracture Multiple, from 06 to 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    263.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    333.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 01:47 PM

    341.8 ft. - Downstream Manhole, Survey Ends - 01:47 PM

Observations (40)

DistanceCodeObservation
341.8AMH01:47 PM
326.7TBC
276.2CM
122TBOpen
67.7CM
340.5CM
170.9TBOpen
0MWL
222.5FM
340.5DAGS
116.6CM
333.4CM
141.5CM
3.9DAGS
263.5CM
218.2B
0MWM
167.2TBA
0MGOCONNECTION AT MH, 3 OCLOCK, ACTIVE
3.9SSS
0AMH01:00 PM
68.8TBA
129CM
219.5TBA
277.5TBOpen
71CM
271.2CM
63.1B
330.1TBOpen
224TBOpen
6CM
169.6FM
118TBACTIVE
64.6TFOpen
0MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
198.6CM
273.2TBA
340.5SSS
218.2FM
14CM

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2017-04-28T08:45:00-07:00