Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2015, 07:31 AM
  • 22 0754_22 0753_20151203_234153.mp4

Date
12/03/2015
W/O
536652
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00821
PipeID
P17111
Time
11:31 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2878
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
WO_536652_TV22057_NOV2015
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0754
Downstream MH
22 0753
Dir. of Survey
Downstream
Length Surveyed
269.1 ft.
Total Length
269.1 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
159
O&M Index
2
O&M Quick
2J00
O&M Rating
106
Overall Index
3
Overall Quick
Overall Rating
265
Pipe schematic from manhole 22 0754 to 22 0753
MH: 22 0754MH: 22 0753downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 07540 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAGNESIUM H.O. START 20%2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start16.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6" - W/ SEVERELY LARGE OFFSET INSIDE LATERAL117.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"168.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"216.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"261.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"266 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish266.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish266.8 ft. MGO - General Observation - MAGNESIUM H.O. FINISH269.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0753

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6" - W/ SEVERELY LARGE OFFSET INSIDE LATERAL

    69.2 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6" - W/ SEVERELY LARGE OFFSET INSIDE LATERAL

Observations (16)

DistanceCodeObservation
2MGOMAGNESIUM H.O. START 20%
269.1AMH22 0753
216.6TFC
0AMH22 0754
266SAV
0MWL
117.2TFC
16.5TFC
168.8TFA
2SAV
3.1DAGS
69.2TFAW/ SEVERELY LARGE OFFSET INSIDE LATERAL
0MWM
266.8DAGS
266.8MGOMAGNESIUM H.O. FINISH
261.2TFC

Properties (5)

additional_info
SC205646
custom_field_two
3
customer
LACSD
datetime
2015-12-03T23:31:00-08:00
sewer_category
GRAVITY