Wastewater/Activity/PacpInspection/1.0Oct 26, 2015, 07:11 PM
  • 30 0329_30 0328_20160209_092229_.mp4

Date
10/26/2015
W/O
B140721
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00878
PipeID
P18002
Time
12:11 PM
Certificate
N/A
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3177
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
REDONDO BEACH
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
05
Purpose
Routine Assessment
Project
WO_536532_TV30036_NOV2015
Material
Vitrified Clay Pipe
Shape
Other
Height
24 in.
Upstream MH
30 0329
Downstream MH
30 0328
Dir. of Survey
Downstream
Length Surveyed
300.1 ft.
Total Length
300.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4122
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole 30 0329 to 30 0328
MH: 30 0329MH: 30 0328downstream0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MWL - Water Level, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 30 032924.3 ft. TBI - Tap Break-In Intruding, at 09 o'clock, -, -, within 8 inches of joint: NO, 4", 2"25.3 ft. TBI - Tap Break-In Intruding, at 09 o'clock, -, -, within 8 inches of joint: NO, 4", 2"61.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"91.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"166.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"240.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"300.1 ft. AMH - Downstream Manhole, Survey Ends - 30 0328

Observations (10)

DistanceCodeObservation
240.7TF
166.1TFA
0MWM
24.3TBI
61.9TFC
0MWL
300.1AMH30 0328
91.6TFC
25.3TBI
0AMH30 0329

Properties (5)

additional_info
SC224991
custom_field_two
4
customer
LACSD
datetime
2015-10-26T12:11:24-07:00
sewer_category
GRAVITY