Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 7, 2015, 12:30 PM
  • 22 0706_22 0705_20151207_044526.mp4

Date
12/07/2015
W/O
536447
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00826
PipeID
P17059
Time
4:30 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2879
Sewer Name
22 SAN DIMAS CONNECTION EXTENSION TRUNK
City
SAN DIMAS, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_536447_TV22088_NOV2015
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
22 0706
Downstream MH
22 0705
Dir. of Survey
Downstream
Length Surveyed
332.6 ft.
Total Length
332.6 ft.
Structural Index
3
Structural Quick
4121
Structural Rating
6
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 22 0706 to 22 0705
MH: 22 0706MH: 22 0705downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 07060 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"92.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"174 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"229.1 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4" - W/ CRACKS252.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"329.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish332.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0705

Observation photos (1)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
329.6SSS
252.8TFC
0MWM
0VC
329.6DAGS
0AMH22 0706
92.4TFC
21.6TFC
332.6AMH22 0705
2SSS
174TFC
0MWL
2DAGS
229.1TBAW/ CRACKS

Properties (5)

additional_info
SC205647
custom_field_two
2
customer
LACSD
datetime
2015-12-07T04:30:00-08:00
sewer_category
TRANSITION