Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 31, 2015, 11:39 AM
  • 22 0850_22 1413_20151231_035323.mp4

Date
12/31/2015
W/O
531046
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00803
PipeID
P17216
Time
3:39 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2946
Sewer Name
22 DALTON TRUNK, SECTION 3
City
AZUSA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_531046_TV22083_DEC2015
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
22 0850
Downstream MH
22 1413
Dir. of Survey
Downstream
Length Surveyed
374.7 ft.
Total Length
374.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 22 0850 to 22 1413
MH: 22 0850MH: 22 1413downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 08500 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. MGO - General Observation - MAGNEZIUM H.O. 45% START44.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"60.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"108.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"117.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"173.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"181.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"237.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"253.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"285.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"317.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"369.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"373.3 ft. MGO - General Observation - MAGNEZIUM H.O. 45% FINISH374.7 ft. AMH - Downstream Manhole, Survey Ends - 22 1413

Observation photos (1)

  • General Observation - MAGNEZIUM H.O. 45% START

    2 ft. - General Observation - MAGNEZIUM H.O. 45% START

Observations (17)

DistanceCodeObservation
2MGOMAGNEZIUM H.O. 45% START
0MWL
285.4TF
369.5TF
317.4TF
60.9TF
181.8TF
0AMH22 0850
374.7AMH22 1413
0MWM
173.4TF
373.3MGOMAGNEZIUM H.O. 45% FINISH
108.6TFA
44.5TF
253.2TF
117.1TF
237.7TF

Properties (5)

additional_info
SC224957
custom_field_two
4
customer
LACSD
datetime
2015-12-31T03:39:51-08:00
sewer_category
GRAVITY