B 0202_B 0201_4242017_044637.mp4
2 ft. - General Observation - MAG COAT 20% START 8:00 TO 4:00
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING CONCRETE
20.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
41.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE
72 ft. - Surface Aggregate Visible, at 02 o'clock, within 8 inches of joint: YES - 1 SEVERE AGG
129.9 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
156.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - FLAKING CONCRETE
349.9 ft. - General Observation - MAG COAT 70% START
359.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - FLAKING CONCRETE
| Distance | Code | Observation |
|---|---|---|
| 156.2 | SSS | FLAKING CONCRETE |
| 0 | MWM | — |
| 20.1 | DAGS | — |
| 129.9 | DAGS | — |
| 41.3 | SSS | FLAKING CONCRETE |
| 678.2 | AMH | 5:20AM |
| 677.4 | DAGS | — |
| 359.2 | SSS | FLAKING CONCRETE |
| 349.9 | MGO | MAG COAT 70% START |
| 0 | MWL | — |
| 677.4 | SSS | BLISTERING ,FLAKING CONCRETE |
| 36.7 | MGO | MAG COAT 60% START |
| 72 | SAV | 1 SEVERE AGG |
| 0 | AMH | 4:40AM |
| 129.9 | DAGS | — |
| 2 | MGO | MAG COAT 20% START 8:00 TO 4:00 |
| 677.4 | MGO | MAG COAT 70% FINISH |
| 2 | SSS | BLISTERING,FLAKING CONCRETE |