Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 20, 2017, 11:50 AM
  • 15 0775_15 0774_4202017_050027.mp4

Date
04/20/2017
W/O
0619123
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00593
PipeID
P12976
Time
4:50 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0501
Sewer Name
15 ARCADIA-SIERRA MADRE TRUNK, SECTS 2&5
City
ARCADIA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
04
Purpose
Capital Improvement Program Assesment
Project
20170420MDM_ARCADIA_SIERRA_MADRE_TRUNK_SECTS_2_5
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
15 0775
Downstream MH
15 0774
Dir. of Survey
Downstream
Length Surveyed
240.2 ft.
Total Length
240.2 ft.
Structural Index
3
Structural Quick
4322
Structural Rating
16
O&M Index
3
O&M Quick
4138
O&M Rating
30
Overall Index
3
Overall Quick
Overall Rating
46
Pipe schematic from manhole 15 0775 to 15 0774
MH: 15 0775MH: 15 0774downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED24.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED39.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped42.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Capped43 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG85.1 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YESR88 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YESR111.1 ft. RMJ - Roots Medium Joint, from 08 to 11 o'clock, 5 %, within 8 inches of joint: YESR113.1 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open117.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Peeling & Flaking Throughout The Reach120.1 ft. RMJ - Roots Medium Joint, from 08 to 11 o'clock, 5 %, within 8 inches of joint: YESR125.5 ft. RMJ - Roots Medium Joint, from 12 to 04 o'clock, 10 %, within 8 inches of joint: YESR144.1 ft. RMJ - Roots Medium Joint, from 08 to 11 o'clock, 5 %, within 8 inches of joint: YESR156.7 ft. RMJ - Roots Medium Joint, from 08 to 01 o'clock, 10 %, within 8 inches of joint: YESR193.5 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open 50% ROOTS197 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG198.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active202 ft. RMJ - Roots Medium Joint, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YESR239.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped239.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED239.9 ft. RBJ - Roots Ball Joint, from 08 to 04 o'clock, 80 %, within 8 inches of joint: YESR239.9 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG239.9 ft. MGP - General Photograph - 80% ROOT BALL240.2 ft. MSA - Survey Abandoned - 80% ROOT BALL

Observation photos (10)

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    24.8 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    43 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Roots Medium Joint, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YESR

    85.1 ft. - Roots Medium Joint, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YESR

  • Roots Medium Joint, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YESR

    88 ft. - Roots Medium Joint, from 08 to 04 o'clock, 25 %, within 8 inches of joint: YESR

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    197 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Roots Medium Joint, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YESR

    202 ft. - Roots Medium Joint, from 01 to 04 o'clock, 10 %, within 8 inches of joint: YESR

  • Roots Ball Joint, from 08 to 04 o'clock, 80 %, within 8 inches of joint: YESR

    239.9 ft. - Roots Ball Joint, from 08 to 04 o'clock, 80 %, within 8 inches of joint: YESR

  • General Photograph - 80% ROOT BALL

    239.9 ft. - General Photograph - 80% ROOT BALL

Observations (29)

DistanceCodeObservation
240.2MSA80% ROOT BALL
156.7RMJ
202RMJ
239.9SSSPEELING CONCRETE SEVERE AGG ATTACHED
193.5TFDOpen 50% ROOTS
24.8SSSPEELING CONCRETE SEVERE AGG ATTACHED
197SAMSEVERE AGG
2SAMSEVERE AGG
88RMJ
120.1RMJ
125.5RMJ
0MGOConn. @ Mh, 3 O' Clock. OPEN
113.1TBOpen
43SAMSEVERE AGG
0MWM
111.1RMJ
85.1RMJ
117.7TFCPeeling & Flaking Throughout The Reach
239.9RBJ
42.2TFCCapped
239.2TFCCapped
39.2TFCCapped
198.6TFActive
239.9SAMSEVERE AGG
0MWL
144.1RMJ
0AMH4:50AM
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
239.9MGP80% ROOT BALL

Properties (4)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTCHED
custom_field_two
2
customer
LACSD
datetime
2017-04-20T04:50:00-07:00