02 2306_02 2305_4192017_113624.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
133.6 ft. - General Observation - START OF STREET ASPHALT REPAIR PATCH, 133 FT, NO VISIBLE DAMAGE TO PIPE, 12 OCLOCK
137.8 ft. - General Observation - END OF PATCH ON STREET WITH ASPHALT REPAIR, 137 FT, NO VISIBLE DAMAGE TO PIPE AT 12 OCLOCK
331.3 ft. - General Observation - PATCH DIRECTLY ABOVE AT APPROX,. 330 FT TO 340 FT, NO DAMAGE VISIBLE, 12 OCLOCK
340.4 ft. - General Observation - END OF STREET REPAIR, ASPHALT PATCH, 12 OCLOCK, NO VISIBLE DAMAGE TO PIPE
383.6 ft. - Downstream Manhole, Survey Ends - 12:09 PM
| Distance | Code | Observation |
|---|---|---|
| 2 | SSS | — |
| 137.8 | MGO | END OF PATCH ON STREET WITH ASPHALT REPAIR, 137 FT, NO VISIBLE DAMAGE TO PIPE AT 12 OCLOCK |
| 0 | MWM | — |
| 383.6 | AMH | 12:09 PM |
| 340.4 | MGO | END OF STREET REPAIR, ASPHALT PATCH, 12 OCLOCK, NO VISIBLE DAMAGE TO PIPE |
| 0 | MWL | — |
| 331.3 | MGO | PATCH DIRECTLY ABOVE AT APPROX,. 330 FT TO 340 FT, NO DAMAGE VISIBLE, 12 OCLOCK |
| 0 | AMH | 11:34 AM |
| 380.9 | SSS | — |
| 133.6 | MGO | START OF STREET ASPHALT REPAIR PATCH, 133 FT, NO VISIBLE DAMAGE TO PIPE, 12 OCLOCK |