Wastewater/Activity/PacpInspection/1.0Apr 10, 2017, 03:43 PM
  • 19 0015_19 0014_4102017_110959.mp4

Date
04/10/2017
W/O
0602259
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00727
PipeID
P15045
Time
8:43 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7381
Sewer Name
19 PALO VERDE TRUNK
City
LONG BEACH
Loc. details
Woods
Location Code
E
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
08
Purpose
Routine Assessment
Project
20170410MI_PALO_VERDE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
19 0015
Downstream MH
19 0014
Dir. of Survey
Downstream
Length Surveyed
375.2 ft.
Total Length
375.2 ft.
Structural Index
2
Structural Quick
2300
Structural Rating
6
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
9
Pipe schematic from manhole 19 0015 to 19 0014
MH: 19 0015MH: 19 0014downstream0 ft. AMH - Upstream Manhole, Survey Begins - 11:08 AM0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area8.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18.7 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start33.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish34.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start47.4 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish57.2 ft. RFJ - Roots Fine Joint, from 08 to 09 o'clock, within 8 inches of joint: YESR280.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - Unkown372.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish375.2 ft. AMH - Downstream Manhole, Survey Ends - 11:31 AM

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start

    18.7 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

    33.5 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    34.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Roots Fine Joint, from 08 to 09 o'clock, within 8 inches of joint: YESR

    57.2 ft. - Roots Fine Joint, from 08 to 09 o'clock, within 8 inches of joint: YESR

  • Downstream Manhole, Survey Ends - 11:31 AM

    375.2 ft. - Downstream Manhole, Survey Ends - 11:31 AM

Observations (12)

DistanceCodeObservation
0AMH11:08 AM
47.4CL
372.8SSS
0MWL
57.2RFJ
375.2AMH11:31 AM
33.5CL
280.6DSZUnkown
8.1SSS
18.7CL
0MWM
34.9CL

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2017-04-10T08:43:52-07:00