19 0016_19 0015_4102017_104643.mp4
20.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
44.7 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MINERAL DEPOSITS AT JOINTS
60.3 ft. - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES
209 ft. - Roots Fine Joint, from 04 to 05 o'clock, within 8 inches of joint: YESR
311.4 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"
378.9 ft. - Downstream Manhole, Survey Ends - 11:06 AM
| Distance | Code | Observation |
|---|---|---|
| 20.1 | SSS | — |
| 209 | RFJ | — |
| 311.4 | TFA | — |
| 60.3 | CL | — |
| 0 | MWL | — |
| 377 | SSS | — |
| 373.6 | SZ | MINERAL DEPOSITS AT JOINTS |
| 44.7 | SZ | MINERAL DEPOSITS AT JOINTS |
| 0 | AMH | 10:44 AM |
| 0 | MGO | CONNECTION AT MH, 3 OCLOCK, ACTIVE |
| 0 | MWM | — |
| 378.9 | AMH | 11:06 AM |
| 298.1 | CL | — |